boiler ash handling system details in hindi

Details


  • Production capacity: 7-70 MW
  • Work pressure: 1.0-1.6 Mpa
  • Applicable fuel: Nature gas, coke oven gas, blast furnace gas, carbon black off-gas, biogas, methanol, etc.
  • Applicable industry: heat suppling, hospital, colleges and universities.


Product introduction

  SZS Series Boiler is double drums, longitudinal arranged, "D" type chamber structure. Furnace is on right side and convection tube bundle is on the left. The body is fixed on the basement by middle and both end flexible supports and make the boiler to expand horizontally to sideways. Around furnace is membrane water cooling tube wall. Furnace and tube bundle is totally separated by the membrane water tube cooling wall at the left side of the furnace. The back part of bundle is sparse shift structure, front part is aligned structure. Smoke from furnace outlet enters re-burning chamber, bundle area, and then from left front part enters spiral fin coil economizer and condenser, finally discharged to atmosphere through chimney.





Safety

  Boiler body high temperature area adopt forced circulation to make sure each part heating area can be cooled down and avoid vaporization;

  Boiler has explosion door and flame detector for safe and reliable operation.

  comb plates are used as the sealing between both sides of boiler and tube bundle all use to avoid leakage of condensate and gas which is caused by refractory concrete sealing.

  air tightness test is done before leaving the factory to ensure no leakage of gas.

environmental protection

  Bigger combustion chamber and Low emission combustion engine to reduce the NOX to 30mg/Nm3

  Smoke duct and smoke outlet has internal insulation to reduce operating noise.

  Combustion chamber use full membrane water cooling wall structure, pressurized firing without smoke mixture.

energy conservation

  Good quality alumina silicate fiber and fire clay insulation is used, boiler body temperature is controlled below 45℃, to reduce heat lost.

  Combustion chamber use narrow distance tube membrane water cooling wall which has good air tightness, and reduce heat lost and increase boiler thermal efficiency.

  Inside of Inspection holes use high-alumina refractory and man hole cover sealing devices, it solved the high temperature of this part by using refractory brick

Convenience

  Thera are manholes on front and back side of both bundle and inspection doors on back side of boiler, which are easy to open for inspection and cleaning inner part.

longer lifespan

  Membrane structure of Front and back wall is used for boiler body, which highly increased their lifespan to over 20 years.

  The key part such as material cutting, rolling, drilling are proceeded by advanced CNC machining process to reduce the assemble stress and extend boiler working lifetime.

  flutter prevention fastener is used for high temperature part convection tube, which avoid bundle tube cracking problem.

  Longitudinal and girth joint adopt advanced automatic submerged-arc welding for good welding quality. All longitudinal and girth joint will have 100% radiographic inspection.

 
Items
Model
SZS7-1.0/115/70-Q SZS10.5-1.0/115/70-Q SZS14-1.25/115/70-Q SZS17.5-1.25/115/70-Q SZS21-1.25/130/70-Q SZS29-1.25/130/70-Q SZS46-1.6/130/70-Q SZS58-1.6/130/70-Q SZS70-1.6/130/70-Q SZS116-1.6/130/70-Q
Rated thermal power(MW) 7.0 10.5 14.0 17.5 21.0 29 46 58 70 116
Rated working pressure(MPa) 1.0 1.0 1.25 1.25 1.25 1.25 1.6 1.6 1.6 1.6
Rated output water temperature(℃) 115 115 115 115 130 130 130 130 130 130
Rated Feeding water temperature(℃) 70 70 70 70 70 70 70 70 70 70
Heating area(㎡) Main body(㎡) 168.0 220.0 245.30 284.40 394.75 428.1 1065.9 1225.7 1408.4 6164.8
Condenser (㎡) 164.0 306.0 527.0 645.1 738.3 990.8 985.3 1292.5 1642.1 1830
Available fuel Natural gas, biogas, coke oven gas, light oil, methanol, biodiesel etc
Gas consumption(Nm³/h) 720 1080 1440 1800 2160 2982 4680 5760 7200 11880
Thermal efficiency(%) >98 >98 >98 >98 >98 >98 >98 >98 >98 >98
MAX.transportation weight(t) 42.0 48.0 52.5 57.5 65.0 72.5 散件12.6 散件13.8 散件16 散件20
MAX. transportation dimension LxWxH(m) 7.87x3.40x3.34 8.85x3.85x3.93 8.51x3.85x3.75 9.31x3.77x3.75 10.10x4.13x4.15 10.90x4.13x4.15 11.00xΦ1.45 11.10xΦ1.46 12.00xΦ1.66 12.50xΦ1.66

CONTACT FORM



May 1, 2010 A new dry bottom ash handling system continues to burn the bottom ash during the extraction and cooling phase &8211; passing ambient air, instead

Plant Equipment and Maintenance Engineering Handbook &8211; Access

Full details ASH-HANDLING SYSTEMS; 4. A: ACRONYMS AND GLOSSARY; B. APPENDIX B: ASME BOILER AND PRESSURE VESSEL CODE LIST

Ash handling system. 18. Valves. 19. combined cycle power plant. 28. Hydro power 2000; an Indian perspective. 29. Boiler feed pump 34. Circulating FBC

Advantages of Three Phase System over Single Phase System Steam Boiler | Working principle and Types of Boiler Before going into detail of this topic, we will try to understand the line diagram of electric power . 9) Place for ash handling plant for thermal power station should also be available very near by. 10) Very.

Technical Study Report: Biomass Fired FBC Boiler for Cogeneration practical aspects of implementing such a system in an industry. .. Figure 11: Configuration of Extraction cum condensing turbine. 28 .. Indian Ministry of New and Renewable Energy&39;s Annual Report for 2005-06 indicates .. Ash handling system.

Read Practical Boiler Operation Engineering and Power Plant book reviews & author details and more at Amazon.in. All Books Bestsellers New Releases & Pre-orders Hindi, Tamil & other languages . Steam Path; Flue Gas Path; Ash Handling System; Operation of Boiler; Pipes, Tubes and . Total power plant details.

Thermal Power Plant Working | INDIAN POWER SECTOR

Consists of working of thermal power station in detail with each part defined and consists of Generally in modern boilers tangential firing system is used i.e. the coal . ii) Mechanical handling: Mechanical equipment is used for ash disposal,

provides for water requirement of the wet ash handling system also. The data and design data for dry cooling system and work out the details of techno economic system used to be designed for disposal of both fly ash and bottom ash in wet . unit burning typical Indian coal (of 40% ash), the amount of ash generated is.

from water by Boiler Feed Water Treatment, ion-exchange plants, Mixed Bed Resin Pneumatic Conveying system, Bottom ash handling system, Slurry disposal To control the regeneration cycle either of the following systems can be

ASH HANDLING SYSTEM TENDERS, Government Ash Handling System Ash Handling System Tenders,public Ash Handling System Tenders,indian Maintenance works in bottom ash system and ash disposal pipe lines of stage II.

Full details ASH-HANDLING SYSTEMS; 4. A: ACRONYMS AND GLOSSARY; B. APPENDIX B: ASME BOILER AND PRESSURE VESSEL CODE LIST

NPTI Publications &8211; NPTI DELHI

Ash handling system. 18. Valves. 19. combined cycle power plant. 28. Hydro power 2000; an Indian perspective. 29. Boiler feed pump 34. Circulating FBC

Advantages of Three Phase System over Single Phase System Steam Boiler | Working principle and Types of Boiler Before going into detail of this topic, we will try to understand the line diagram of electric power . 9) Place for ash handling plant for thermal power station should also be available very near by. 10) Very.

Technical Study Report: Biomass Fired FBC Boiler for Cogeneration practical aspects of implementing such a system in an industry. .. Figure 11: Configuration of Extraction cum condensing turbine. 28 .. Indian Ministry of New and Renewable Energy&39;s Annual Report for 2005-06 indicates .. Ash handling system.

Read Practical Boiler Operation Engineering and Power Plant book reviews & author details and more at Amazon.in. All Books Bestsellers New Releases & Pre-orders Hindi, Tamil & other languages . Steam Path; Flue Gas Path; Ash Handling System; Operation of Boiler; Pipes, Tubes and . Total power plant details.

Consists of working of thermal power station in detail with each part defined and consists of Generally in modern boilers tangential firing system is used i.e. the coal . ii) Mechanical handling: Mechanical equipment is used for ash disposal,

Report on minimisation of water requirement in coal based thermal

provides for water requirement of the wet ash handling system also. The data and design data for dry cooling system and work out the details of techno economic system used to be designed for disposal of both fly ash and bottom ash in wet . unit burning typical Indian coal (of 40% ash), the amount of ash generated is.

from water by Boiler Feed Water Treatment, ion-exchange plants, Mixed Bed Resin Pneumatic Conveying system, Bottom ash handling system, Slurry disposal To control the regeneration cycle either of the following systems can be