  • Production capacity: 7-70 MW
  • Work pressure: 1.0-1.6 Mpa
  • Applicable fuel: Nature gas, coke oven gas, blast furnace gas, carbon black off-gas, biogas, methanol, etc.
  • Applicable industry: heat suppling, hospital, colleges and universities.


Product introduction

  SZS Series Boiler is double drums, longitudinal arranged, "D" type chamber structure. Furnace is on right side and convection tube bundle is on the left. The body is fixed on the basement by middle and both end flexible supports and make the boiler to expand horizontally to sideways. Around furnace is membrane water cooling tube wall. Furnace and tube bundle is totally separated by the membrane water tube cooling wall at the left side of the furnace. The back part of bundle is sparse shift structure, front part is aligned structure. Smoke from furnace outlet enters re-burning chamber, bundle area, and then from left front part enters spiral fin coil economizer and condenser, finally discharged to atmosphere through chimney.





Safety

  Boiler body high temperature area adopt forced circulation to make sure each part heating area can be cooled down and avoid vaporization;

  Boiler has explosion door and flame detector for safe and reliable operation.

  comb plates are used as the sealing between both sides of boiler and tube bundle all use to avoid leakage of condensate and gas which is caused by refractory concrete sealing.

  air tightness test is done before leaving the factory to ensure no leakage of gas.

environmental protection

  Bigger combustion chamber and Low emission combustion engine to reduce the NOX to 30mg/Nm3

  Smoke duct and smoke outlet has internal insulation to reduce operating noise.

  Combustion chamber use full membrane water cooling wall structure, pressurized firing without smoke mixture.

energy conservation

  Good quality alumina silicate fiber and fire clay insulation is used, boiler body temperature is controlled below 45℃, to reduce heat lost.

  Combustion chamber use narrow distance tube membrane water cooling wall which has good air tightness, and reduce heat lost and increase boiler thermal efficiency.

  Inside of Inspection holes use high-alumina refractory and man hole cover sealing devices, it solved the high temperature of this part by using refractory brick

Convenience

  Thera are manholes on front and back side of both bundle and inspection doors on back side of boiler, which are easy to open for inspection and cleaning inner part.

longer lifespan

  Membrane structure of Front and back wall is used for boiler body, which highly increased their lifespan to over 20 years.

  The key part such as material cutting, rolling, drilling are proceeded by advanced CNC machining process to reduce the assemble stress and extend boiler working lifetime.

  flutter prevention fastener is used for high temperature part convection tube, which avoid bundle tube cracking problem.

  Longitudinal and girth joint adopt advanced automatic submerged-arc welding for good welding quality. All longitudinal and girth joint will have 100% radiographic inspection.

 
Items
Model
SZS7-1.0/115/70-Q SZS10.5-1.0/115/70-Q SZS14-1.25/115/70-Q SZS17.5-1.25/115/70-Q SZS21-1.25/130/70-Q SZS29-1.25/130/70-Q SZS46-1.6/130/70-Q SZS58-1.6/130/70-Q SZS70-1.6/130/70-Q SZS116-1.6/130/70-Q
Rated thermal power(MW) 7.0 10.5 14.0 17.5 21.0 29 46 58 70 116
Rated working pressure(MPa) 1.0 1.0 1.25 1.25 1.25 1.25 1.6 1.6 1.6 1.6
Rated output water temperature(℃) 115 115 115 115 130 130 130 130 130 130
Rated Feeding water temperature(℃) 70 70 70 70 70 70 70 70 70 70
Heating area(㎡) Main body(㎡) 168.0 220.0 245.30 284.40 394.75 428.1 1065.9 1225.7 1408.4 6164.8
Condenser (㎡) 164.0 306.0 527.0 645.1 738.3 990.8 985.3 1292.5 1642.1 1830
Available fuel Natural gas, biogas, coke oven gas, light oil, methanol, biodiesel etc
Gas consumption(Nm³/h) 720 1080 1440 1800 2160 2982 4680 5760 7200 11880
Thermal efficiency(%) >98 >98 >98 >98 >98 >98 >98 >98 >98 >98
MAX.transportation weight(t) 42.0 48.0 52.5 57.5 65.0 72.5 散件12.6 散件13.8 散件16 散件20
MAX. transportation dimension LxWxH(m) 7.87x3.40x3.34 8.85x3.85x3.93 8.51x3.85x3.75 9.31x3.77x3.75 10.10x4.13x4.15 10.90x4.13x4.15 11.00xΦ1.45 11.10xΦ1.46 12.00xΦ1.66 12.50xΦ1.66

CONTACT FORM



See who you know at ZG Boiler &8211; Industrial boiler Company, leverage your of the boiler, the products exported to Pakistan, Russia, Thailand, Vietnam, Iran, Provide coal fired chain grate boiler for Pakistan market, like textile industry etc

Design and Construction Overview of the Biggest Coal Fired Power

Heavy Industries, Ltd. (MHI) received under Mitsubishi Corporation an order from BLCP Power plant which will be Thailand&39;s first large scale bituminous coal-fired power plant on a full The boilers are forced circulation, exclusively coal-fir-.

The co-firing of biomass with the coal in traditional coal-fired boilers makes use of the large investment and Thailand; 1. Taiwan; 1 coal-fired power plants have experience with co-firing biomass or waste, at least on a trial basis. The.

Coal Kimberly Clark Steam Facility 3- TPH Stoker Coal Fired Facility Owner: Kimberly Clark Corporation Project Location: Hat Yai, Thailand Project. The facility includes a field-erected coal-fired boiler designed to provide 90 psig steam to an

Locafion: Bangkok, Thailand Environmental regulations of coal-fired power plants in Asia cover a broad . in two areas of a fossil fuel-fired power plant: the boiler and .. son-Wesley Publishing Company, Massachusetts 1963. Table 2.

Mar 10, 2015 EPC contract for a new ultra-supercritical coal-fired power plant unit in Thailand. Marubeni Corporation, in partnership with Alstom, has jointly signed a Use of ultra-supercritical technology for the boiler will significantly

Marubeni Awarded Coal-Fired Thermal Power Plant from the

Mar 10, 2015 Marubeni Awarded Coal-Fired Thermal Power Plant from the Electricity Generating Authority of Thailand. On March 9, 2015, Marubeni Corporation (&8220;Marubeni&8221;), in partnership with ALSTOM Power Use of ultra-supercritical conditions for the boiler will significantly reduce its environmental footprint and

Jan 6, 2014 construction of the Thai Binh coal-fired thermal power plant (total gross turbines and generators from Fuji Electric Co., Ltd. and boilers from

Horizontal coal fired steam boiler is widely used in textile, printing and dyeing, Zhengzhou Boiler CO.; Ltd is a leading industrial horizontal boiler manufacturer and Southeast Asia(Vietnam, Laos, Cambodia, Thailand, Myanmar, Malaysia,

HAMADA BOILER (THAILAND) CO.,LTD. 38 Mooban Seree 3 Soi 5, Rama IX Road. Soi 49, Suanluang, Bangkok 10250, Thailand. Tel. +66-2-718 9815 Fax.

The newly ordered plant will consist of two subcritical pressure boilers and two 717 Construction of the new big coal-fired power plant particularly corresponds with MHI, with Mitsubishi Corporation, has previously delivered a number of

Coal firing power plant in Thailand | DIASYS Netmation | MHPS

Coal firing power plant in Thailand large scale coal firing conventional plant which consists of a coal fired boiler and a reheat steam turbine. About Company.

Coal Fired Boiler, Buy Various High Quality Coal Fired Boiler Products from Double Dragon International Industrial & Mining Machinery Co., Ltd.

See who you know at ZG Boiler &8211; Industrial boiler Company, leverage your of the boiler, the products exported to Pakistan, Russia, Thailand, Vietnam, Iran, Provide coal fired chain grate boiler for Pakistan market, like textile industry etc

Heavy Industries, Ltd. (MHI) received under Mitsubishi Corporation an order from BLCP Power plant which will be Thailand&39;s first large scale bituminous coal-fired power plant on a full The boilers are forced circulation, exclusively coal-fir-.

The co-firing of biomass with the coal in traditional coal-fired boilers makes use of the large investment and Thailand; 1. Taiwan; 1 coal-fired power plants have experience with co-firing biomass or waste, at least on a trial basis. The.

Kimberly Clark Steam Facility | ESI

Coal Kimberly Clark Steam Facility 3- TPH Stoker Coal Fired Facility Owner: Kimberly Clark Corporation Project Location: Hat Yai, Thailand Project. The facility includes a field-erected coal-fired boiler designed to provide 90 psig steam to an